SAE1020 Large Diameter 350mm Seamless Steel Pipe

Product Details
Customization: Available
Type: Seamless
Technique: Hot Rolled
Still deciding? Get samples of US$ 100/Piece
Request Sample

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
4
Year of Establishment
2015-10-29
  • SAE1020 Large Diameter 350mm Seamless Steel Pipe
  • SAE1020 Large Diameter 350mm Seamless Steel Pipe
  • SAE1020 Large Diameter 350mm Seamless Steel Pipe
  • SAE1020 Large Diameter 350mm Seamless Steel Pipe
  • SAE1020 Large Diameter 350mm Seamless Steel Pipe
  • SAE1020 Large Diameter 350mm Seamless Steel Pipe
Find Similar Products

Basic Info.

Surface Treatment
Black/Varnishing/Polished/Antiseptical/Oiled......
Usage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape
Round
Transport Package
Snakeskin Bag/Wooden Carton
Specification
OD: 25mm-508mm, WT: 3mm-100mm
Trademark
HYT
Origin
China
HS Code
7304900000
Production Capacity
600000 Tons Per Year

Product Description

What can we do for you?  

Mainly used in petrochemical industry;aviation and aerospace industry;pharmaceutical industry;gas exhaust; power plant; ship building;water treatment,etc.


Basic Information:

Size range
Outside Diameter: 25mm~508mm
Wall Thickness: 3mm~100mm
Tolerance of outside diameter: +/-1%
Tolerance of wall thickness: +10%/-12.5%
Type: Round
End: bevel end/BE/butt weld, PE/ plain end
Surface:nature color, black painting, 3PE coating

Heat treatment
Stress relieves and Annealing and QT etc ,Assure good performance in application.



Specification:
 
Product Name
 
Material Standard Size(mm) Application
Low temperature tube 16MnDG
10MnDG
09DG
09Mn2VDG
06Ni3MoDG
ASTM A333
GB/T18984-
2003
ASTM A333
 
OD: 25mm~508mm
WT:3mm~100mm
Apply to - 45 ºC ~ 195 ºC low temperature pressure vessel and low temperature heat exchanger pipe
High-pressure boiler tube
 
20G
ASTMA106B
ASTMA210A
ST45.8-III
GB5310-1995
ASTM SA106
ASTM SA210
DIN17175-79
 
OD:8-1240*
WT:1-200
Suitable for manufacturing high pressure boiler tube, header, steam pipe, etc
Petroleum cracking tube 10
20
 
GB9948-2006 OD: 8-630*
WT:1-60
Used in oil refinery furnace tube, heat exchanger tube
Low medium pressure boiler tube 10#
20#
16Mn,Q345
GB3087-2008 OD:8-1240*
WT:1-200
Suitable for manufacturing various structure of low and medium pressure boiler and locomotive boiler
General structure
of the tube
10#,20#,45#,27SiMn
ASTM A53A,B
16Mn,Q345
GB/T8162-
2008
GB/T17396-
1998
ASTM A53
 
OD:8-1240*
WT:1-200
Apply to the general structure, engineering support, mechanical processing, etc
Oil casing J55,K55,N80,L80
C90,C95,P110
API SPEC 5CT
ISO11960
 
OD:60-508*
WT:4.24-16.13
 
Used for extraction of oil or gas in oil Wells casing, used in oil and gas well sidewall
 


Inspection Equipment:

SAE1020 Large Diameter 350mm Seamless Steel Pipe


Packing & Delivery:
 
Package 1)bundle with strip
2)water-proof sheeting
3)woven bags
4)PVC package
5)clients' Requirements
Shipping 1)20ft container: 26tons (Can load 5.8M Max)
2)40ft container: 26tons (Can load 12M Max)
3)more than 100tons:can pack by bulk vessel
4)as your requirement
Port of Shipment
 
Shanghai/Tianjin Port, China
Date of Delivery
 
According To The Quantity And Specification Of Each Order

SAE1020 Large Diameter 350mm Seamless Steel Pipe


Why trust us?


SAE1020 Large Diameter 350mm Seamless Steel Pipe



Application:


SAE1020 Large Diameter 350mm Seamless Steel Pipe



FAQ:
1) Are you manufacturer or trading company? 
We are manufacturer. (Please see the details on our website: www.china-jshyt.com)

2) Where is your factory?
We are a group, in order to meet different demands of our customers, we had developed many subsidiary corporations in Shandong, Tianjin, Hebei,Jiangsu and Shanghai.


3) What's the delivery time?
If we have inventory, it is 7-10 days

Generally speaking, it's around 15 days from the date of receiving payment.

If there any more question, please feel free to contact the sales without any hesitate.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
Product Groups
More